Industrial Thermal Oil Heat Jacket Reactor

Industrial Thermal Oil Heat Jacket Reactor

Industrial Thermal Oil Heat Jacket Reactor Introduction Industrial Thermal Oil Heat Jacket Reactor is commonly used in stainless steel SUS304+ ordinary carbon steel. It is a typical main reaction equipment in chemical production. It is widely used in the production of chemical products such as...
Chat Now

Product Details

Industrial Thermal Oil Heat Jacket Reactor Introduction

Industrial Thermal Oil Heat Jacket Reactor is commonly used in stainless steel SUS304+ ordinary carbon steel. It is a typical main reaction equipment in chemical production. It is widely used in the production of chemical products such as resin, adhesive, paint, cosmetics and pharmaceutical.

Agitating, mixing, and dispersing a plurality of materials by stirring, heating, and cooling, and simultaneously applying a corresponding cooling and heating load to adjust/vacuum, thereby stirring the materials in the sealed can body.

The structure generally consists of a reactor tank, a transmission mechanism, a stirring device, a heating device and a cooling device system, a sealing device, an auxiliary support and the like. Corresponding auxiliary equipment: fractionation column, condenser, water separator, collection tank, filter, vacuum pump and vacuum tank.

(47H[NTM_[IKUBBM8S63COA

Installation of pipelines, including:

1. The installation of the pipeline should comply with the provisions of the “Safety Technical Supervision Regulations for Organic Heat Carrier Furnace”. The main material of the gas boiler used for the pressurized pipeline should have a corresponding quality certificate. The pipeline connection port should be used in addition to the flange. Welded connection.

2, pipeline welding must be welded by the corresponding qualified welder, the pipeline layout should have a slope of 2-3%, and the exhaust port is set at the high point of the zui of the pipeline, and the sewage outlet is set at the low point of Zui. The oil separator is installed and the upper part is connected through an expansion tube.

3. The valve adopts a flange not lower than PN1.6Mpa (pg) and temperature resistance above 400 °C. The flange gasket is made of metal-wound graphite gasket. The weight of the hot oil pipeline shall not be placed on the furnace body and the hot oil circulation pump, and the thermal expansion range shall be fully considered.

4. The flange of the pipe flange is PN1.6Mpa (pg) or more.

About Trade Term

Q: What’s the trade term for making business with us?

A: FOB; It’s mainly depend on client’s requirement;

About Delivery Time

Q: What’s the Delivery time after placing order ?

A: Usually it takes about 25~30 days after we received your deposit.

However, it would depend on our production line schedule(the timing clients place order)and the manufacturing process of the item.

About Payment Term

Q: What’s the Payment Term?

A: By T/T.(40% by T/T for an order, the balance to be paid before delivery.


Inquiry